Recent Projects
Channel Tunnel Rail Link
We were involved with birse on the termination of 11KV to 25KV Cables at the new St Pancras Station and a long side the track. Also terminations HV cables along side the new railway lines.
BBC Great Portland Street London
CCS Cable are pleased to be associated with Hills Electrical on this refurbishment of the BBC Studios in the preparation for the 2012 Olympic games. We were responsible for installing L.V Cables and terminating.
Xcape Project - Castleford
This indoor artificial Ski slope and shopping centre was cabled through out and terminated by CCS Cable. This prestidge project was completed on time and without any Health and Safety issues involving our skilled force.
BP1 Project - Canary Wharf
CCS Cable installs to high standards 4 No 2 MVA generators, generating at 11kv for essential service back up. We were proud to be a part of this prestigious building and are currently still involved in installation of stand by power & gas powered CHP at DS3.
Wembley Stadium
CCS Cable were chosen for the installation of 2 no emergency standby generators, to pick up emergency power services in the event of power failure.
Heathrow Control Tower
We installed the 1250 KVA standby generator & associated fuel installation to pick up tower load in event of mains failure.