Recent Projects

Channel Tunnel Rail Link

Complete Cable Services - Channel Tunnel

We were involved with birse on the termination of 11KV to 25KV Cables at the new St Pancras Station and a long side the track. Also terminations HV cables along side the new railway lines.




Complete Cable Services - BBC Offices

BBC Great Portland Street London

CCS Cable are pleased to be associated with Hills Electrical on this refurbishment of the BBC Studios in the preparation for the 2012 Olympic games. We were responsible for installing L.V Cables and terminating.




Xcape Project - Castleford

Complete Cable Services - Xcape Project

This indoor artificial Ski slope and shopping centre was cabled through out and terminated by CCS Cable. This prestidge project was completed on time and without any Health and Safety issues involving our skilled force.





Complete Cable Services - Canary Wharf Project

BP1 Project - Canary Wharf

CCS Cable installs to high standards 4 No 2 MVA generators, generating at 11kv for essential service back up. We were proud to be a part of this prestigious building and are currently still involved in installation of stand by power & gas powered CHP at DS3.





Complete Cable Services - Wembley Stadium

Wembley Stadium

CCS Cable were chosen for the installation of 2 no emergency standby generators, to pick up emergency power services in the event of power failure.




Complete Cable Services - Heathrow Control Tower

Heathrow Control Tower

We installed the 1250 KVA standby generator & associated fuel installation to pick up tower load in event of mains failure.